Hi guys,
Any possibility to build this out a bit to cover 3-7 days if possible. Not necessarily sequential,
Set a shedule, then apply a date to it.
Use system time to trigger as for time triggering?
Would make me life much easier and the work I'm doing at the moment (all remote) is about to expand.
Thanks
Mike
Any possibility to build this out a bit to cover 3-7 days if possible. Not necessarily sequential,
Set a shedule, then apply a date to it.
Use system time to trigger as for time triggering?
Would make me life much easier and the work I'm doing at the moment (all remote) is about to expand.
Thanks
Mike
Posté Tue 22 Feb 22 @ 1:08 pm
Nothing??
Posté Fri 25 Feb 22 @ 9:41 am